Job Report

HBR 609 – Construction of wharfage, Netherlands

By September 1, 2014December 2nd, 2019No Comments

HBR 609 - Construction of wharfage, Netherlands

August – September 2014

Contractor : Geotech Foundation Solutions B.V. (GFS), Netherlands

Master of works: Groningen Seaports B.V

Location : Eemshaven Netherlands

Project description : New construction of Citizens’ and Media Centre

Equipment : Huette HBR 609

Job description

A Hütte HBR 609 was used together with a drill mast type DM260 and a hydraulic hammer type Eurodrill HD8032. Handling of cases was done with a hydraulic double acting manipulator HDM 89-220. This manipulator has a range for drilling pipes Ø 89-220 mm with a single length of 2 to 6 m.

Find here further details on the drilling works.

Download the job report!
Download

Leave a Reply

We respect your privacy

On this website we use first or third-party tools that store small files (cookie) on your device. Cookies are normally used to allow the site to run properly (technical cookies), to generate navigation usage reports (statistics cookies) we do not use any kind of (profiling cookies). We can directly use technical cookies, but you have the right to choose whether or not to enable statistical and profiling cookies. Enabling these cookies, you help us to offer you a better experience.

Cookie policy