HBR 609 – New construction of Citizens’ and Media Centre, Struttgart

By May 15, 2015December 2nd, 2019No Comments

HBR 609 - New construction of Citizens' and Media Centre, Struttgart

15/05/2015

Performing Drilling Company : Harald Gollwitzer GmbH, Floß

Planners: FISCHER Weilheim Co. Vermögen und Bau Baden-Württemberg

Location : Struttgart

Project description : New construction of Citizens’ and Media Centre

Equipment : Huette HBR 609

Anchor performance : 1003 meters of anchors; Double anchor, scaled in height, 0.50 m; Vertical inclination between 45 ° and 37.5 °

Project Description

As the Stuttgart ground always represents a major challenge for the foundation industry and as this area is even more challenging due to strongly alternating ground layers, LAP planned the grouted anchoring with double anchors. The double anchors were arranged with a height difference of about 0.50 m and swiveled for 3 ° against each other. To achieve optimum base courses, the anchors were furthermore inclined vertically by 45 °.

Find here further details on the drilling works.

Download the job report!
Download

Leave a Reply

We respect your privacy

On this website we use first or third-party tools that store small files (cookie) on your device. Cookies are normally used to allow the site to run properly (technical cookies), to generate navigation usage reports (statistics cookies) we do not use any kind of (profiling cookies). We can directly use technical cookies, but you have the right to choose whether or not to enable statistical and profiling cookies. Enabling these cookies, you help us to offer you a better experience.

Cookie policy